The Effect of Toll Road Construction on The Daily Income at PT. Jasa Marga (Persero) Tbk
Abstract
The study aims to determine the influence of each toll road construction segment on the daily income. The research employed a quantitative method to get an overview of the daily income at PT. Jasa Marga (PERSERO) Tbk. The results of this study showed: correlation coefficient analysis, determination test, simple regression test, and descriptive statistical analysis. The results revealed that there was a correlation coefficient between "toll road construction" and "daily income" at PT. Jasa Marga (PERSERO) Tbk of r = 0.899, which is classified as very strong, and the determinant coefficient or the magnitude of the influence of "toll road construction" on "daily income" is 80.9%, which is classified as very strong. Based on the results of the study, the researchers concluded that there was a significant influence between toll road construction and daily income at PT. Jasa Marga (PERSERO) Tbk. which is.